top of page

About Us

Business Team

(1) Trenching works: 132kV cables, 11kV cables and low voltage cables;
(2) Cable connection works: 22kV cables, 11kV cables and low voltage cables;
(3) T&D - E&M works: Switch room, AMI, PV/EV;
(4) Fiber optic connection works;
(5) Power plant maintenance works;
Synergies can be created.

Replace Smart Meter-06.jpeg

©  2023 Wang Yu Engineering Company Limited

All rights reserved, may not be reproduced|disclaimer  |Privacy Policy

bottom of page